When going to height with scaffolding, it is important that the scaffold is secure during from the erection process to disassembly. 7’ safety rails are replaced by 7’ double safety rail, which is the same two rails welded together by way of two ribs for a more secure assembly – all with same attachment configuration. This is accomplished by use of a gravity flip lock, which will allow you to straighten to attach rail then lay perpendicular to mount so that end is secure.ĭeluxe safety equipment works nearly the same as the budget system, there are two receivers on the panel that secure to stack pins in the same manner a female safety pole would.

Attach cross braces at connection points and continue in this manner until all levels are complete.At no point should anyone lean themselves or anything else on these frames during this process, as they will bear no load. Make sure to secure frame via pigtails before continuing. This will allow erector to assemble the next set without having to balance frames. Frames will stand temporarily on their own (FOR ERECTION PURPOSES ONLY) if placed solely on stack pins protruding from the tops of the set below.Secure our all aluminum model by way of wind latch at the bottom and on the end of the board.

Secure aluminum plywood boards by sliding a nail or running wire through our “nail hole” on each hook. Assemble platforms by placing desired amount (1, 2 or 3) of walkboards next to one another by laying two hooks over one main horizontal tube and remaining two over the opposite.The simplest way to erect higher levels is to assemble a platform at that level and to either pass frames and braces up or raise them with our pulley-wheel system.If you have just assembled the first set of a 26’ tower, go ahead and attach outriggers at this point for maximum safety and security.If you are building a tower, attach and secure all safety equipment possible during erection when attachment becomes possible.When you complete this foundational set, we advise the use of a carpenter’s level to ensure that the tower is level both horizontally and vertically.

Secure opposite cross brace by aligning connection points and making connections this should be simple as connection points are already in position.A set will stand like this, but is not safe to climb on or leave idle for any period of time. Secure opposite end of first cross brace to second frame, rendering what amounts to three sides of a set.Attach one end of a cross brace at either connection point (high or low), then secure the second connection point on same end of same brace, this will allow you to securely lean frame and brace on ground if necessary (working lone) or allows second man to simply align frame with the already positioned brace ends.Flip locks work by straightening tab to allow brace to slide on, then letting tab fall to block end of brace from disconnection. C-locks work by raising lock to expose attachment stud and placing brace end over tab and allowing lock to fall back in place, securing end. Braces attach to studs on the frames and secure by either a c-lock or gravity flip lock.To assemble initial set of frames (foundational set if assembling a multi-leveled tower) stand one frame in or near desired position.*If using wheels – Make sure all locks are properly functioning and in the locked positioning before going further. For base plates and wheels (in conjunction with jacks or otherwise) this includes securing with pigtails, jacks are secured by gravity and for this stage should be set to lowest setting. Secure footing materials (base plates, wheels or jacks) in bottom of vertical tubing of initial set at this point.During assembly, make sure that all parts are properly attached and secured by appropriate means (pigtail, span pin, tube clamp, etc.) before continuing erection. *Before beginning erection, an important note. Make sure tits of spring rivets lock into position by aligning the holes in the stack pin with the holes in the vertical tubing.If there are no silver stack pins in your frames, locate and insert stack pins at the top of vertical tubes by compressing spring rivet tits so that pin will fit in tube.If you do not require stack pins, skip steps 1 & 2. ’s Steel-Frame Scaffold Tower Erection and Assembly Instructions